https://www.polity.org.za
Deepening Democracy through Access to Information
Home / News / All News RSS ← Back
Africa|Eskom|Gas|Infrastructure|Power|Storage|System|Turbines|Water|Infrastructure|Turbines
Africa|Eskom|Gas|Infrastructure|Power|Storage|System|Turbines|Water|Infrastructure|Turbines
africa|eskom|gas|infrastructure|power|storage|system|turbines-company|water|infrastructure|turbines-person
Close

Email this article

separate emails by commas, maximum limit of 4 addresses

Sponsored by

Close

Article Enquiry

Electricity system remains constrained and vulnerable – Eskom

Close

Embed Video

Electricity system remains constrained and vulnerable – Eskom

Electricity system remains constrained and vulnerable – Eskom
Photo by Bloomberg

11th November 2019

By: African News Agency

SAVE THIS ARTICLE      EMAIL THIS ARTICLE

Font size: -+

South Africa's electricity system remains extremely constrained and vulnerable as generating plants perform at very low levels of reliability, with a probability of rotational blackouts being implemented if there is any unexpected deterioration, power company Eskom said on Monday.

Eskom said it had made good progress over the weekend to replenish diesel for its open cycle gas turbines and to increase water levels at pumped storage schemes.

Advertisement

Years of failure to adequately maintain its infrastructure have left Eskom's generating units vulnerable to breakdowns, forcing the cash-strapped State utility to implement rolling powercuts several times this year to avoid tripping the national grid.

Eskom, which has not implemented load-shedding since Friday morning, said it did not expect to do so on Monday as unplanned breakdowns remained marginally below 9 500 MW.

Advertisement

"But the probability of load-shedding remains if there is any unexpected shift on the system," it cautioned, referring to possible additional unplanned breakdowns or the unavailability of diesel for open cycle gas turbines or water levels at pumped storage schemes.

It said its Emergency Response Command Centre continued to monitor the system on the hour, with the generating plant performance remaining unpredictable.

EMAIL THIS ARTICLE      SAVE THIS ARTICLE

To subscribe email subscriptions@creamermedia.co.za or click here
To advertise email advertising@creamermedia.co.za or click here

Comment Guidelines

About

Polity.org.za is a product of Creamer Media.
www.creamermedia.co.za

Other Creamer Media Products include:
Engineering News
Mining Weekly
Research Channel Africa

Read more

Subscriptions

We offer a variety of subscriptions to our Magazine, Website, PDF Reports and our photo library.

Subscriptions are available via the Creamer Media Store.

View store

Advertise

Advertising on Polity.org.za is an effective way to build and consolidate a company's profile among clients and prospective clients. Email advertising@creamermedia.co.za

View options
Free daily email newsletter Register Now